Complete Tunnel Boring Machine Conveyor System
📦 System Overview:
-
Conveying Capacity: Up to 485 tons/hour
-
Tunnel Conveyor (TC100):
-
Belt Width: 800 mm
-
Belt Speed: 2.75 – 3.25 m/s
-
Installed Power: 1,540 kW (Head Drive, Booster, and Tail Drive)
-
-
Surface Conveyor (SC120):
-
Belt Width: 1,000 mm
-
Installed Power: 132 kW
-
Bridge Length: 130 meters
-
Belt Length: 260 meters
-
🧱 Component Highlights:
-
Main Drive Station: 3 × Siemens Flender B3DH11 (345 kW each)
-
Booster Station: 1 × Siemens Flender B3DH11 (345 kW)
-
Tail Drive (TBM Side): 1 × Siemens Flender B3DH08 (160 kW)
-
Belt Storage System:
-
80-meter structure
-
620-meter belt capacity
-
HW700-2 hydraulic tensioning winch (180 kN pull force)
-
-
Transfer Station and Control Container included
-
Steel Cord Reinforced Conveyor Belt:
-
Total Length: 26.8 km (approx. 500 tons)
-
Grade: EN14973-A 800 and 1000 mm wide
-
🌍 Logistics & Availability:
-
System disassembly will start soon, will be staged, and documented for international shipment
-
Inspection in Sweden available by appointment
-
Full logistics, splicing, and support can be coordinated upon request