Orostudio Automatic Gold & Silver Refining Plant

Orostudio gold and silver refining line identified with an ORS 200D/200 Drone aqua-regia plant, ORS EAu 20 electrolytic gold unit, ORS EAg 12 silver unit, and fumes-neutralization equipment. Confirm the complete scope, configuration, condition, utilities, documentation, and commissioning requirements.

Request Price & DetailsAsk about specifications, inspection, availability, and freight.
Description

Orostudio Automatic Gold and Silver Refining Plant

This listing presents an Orostudio precious-metals refining line built around the ORS 200D/200 Drone aqua-regia gold refining system, with electrolytic gold and silver equipment and a fumes-neutralization system identified in the offered line. Confirm the exact included equipment, model suffixes, serial numbers, year, condition, utilities, documentation, and commissioning scope before purchase.

Equipment identified in the listing

  • ORS 200D/200 Drone: automatic aqua-regia gold refining plant
  • ORS EAu 20: electrolytic gold refining plant
  • ORS EAg 12: electrolytic silver refining plant; confirm nameplate and installed specification
  • ORS 8-5000 T: triple-tower fumes-neutralization unit; confirm tower, fan, pump, duct, and control scope

Published Orostudio model data

Orostudio publishes the ORS 200D/200 Drone with double 200 + 200 liter dissolution reactors, a 200 liter precipitation reactor, 20–40 kg per batch in each dissolution reactor, and a stated 12-hour output of up to 240 kg. The manufacturer lists 400 V, 50 Hz, three-phase or 230 V, 60 Hz, three-phase electrical configurations and identifies the ORS VCM120 as part of the published package.

For the ORS EAu 20, Orostudio publishes production of more than 20 kg per day with two 35 liter cells. These are manufacturer model-series specifications; confirm that the equipment offered here matches the installed configuration and available nameplates.

Review the manufacturer’s Orostudio automatic gold refining plant data and confirm the final line configuration with Mine Liquidators.

Process and site information to provide

  • Feed material, assay, karat range, contaminants, batch size, and daily throughput target
  • Required finished-metal purity and whether aqua-regia, electrolytic gold, or electrolytic silver stages are needed
  • Available voltage, frequency, phase, connected load, process water, cooling, compressed air, and drainage
  • Acid storage and transfer, secondary containment, ventilation, scrubber discharge, wastewater treatment, and local permitting requirements
  • Room layout, floor loading, access, operator workflow, laboratory support, and product-security requirements

Condition, documentation, and scope review

Request current photographs, nameplate images, equipment and instrument lists, piping and instrumentation diagrams, electrical drawings, PLC and HMI backups, manuals, maintenance history, calibration records, spare-parts lists, and any available operating or test records. Inspect reactors, cells, tanks, pumps, valves, piping, filters, controls, sensors, ventilation, and neutralization equipment.

Confirm whether the plant has been chemically cleaned and neutralized, how components will be preserved and packed, and who is responsible for engineering review, installation, operator training, permitting, commissioning, and process validation. Precious-metal refining uses corrosive chemicals and controlled emissions, so the installation and operating plan should be reviewed by qualified process, electrical, environmental, and safety professionals.

Request the complete equipment schedule

Contact Mine Liquidators for the offered-equipment list, available records, inspection arrangements, pricing, location, and freight information. Also compare the Tera Automation ingot production line and browse our gold and silver processing equipment.