Tera Automation Gold & Silver Ingot Production Line

Tera Automation gold and silver ingot production line identified with T-Barmaster furnace equipment plus brushing, pressing, numbering, and blister-packaging stations. Confirm installed models, tooling, controls, condition, documentation, utilities, and commissioning scope.

Request Price & DetailsAsk about specifications, inspection, availability, and freight.
Description

Tera Automation Gold and Silver Ingot Production Line

This listing presents a Tera Automation precious-metal ingot production line with induction tunnel-furnace and downstream finishing equipment. The listing identifies T-Barmaster furnace models and T-Brush, T-Press, T-Numbering, and T-Blister stations. Confirm every installed model, version, serial number, year, condition, tooling package, software license, and included component before purchase.

Equipment identified in the listing

  • T-Barmaster 400: induction tunnel furnace for precious-metal bars up to 400 oz
  • T-Barmaster One: induction tunnel furnace for smaller bar formats
  • T-Brush: ingot finishing station
  • T-Press: pressing and marking station
  • T-Numbering: programmable marking and serialization station
  • T-Blister: bar and coin blister-packaging station

Published T-Barmaster model data

Tera Automation publishes the T-Barmaster One for bar formats from 1 oz to 1 kg. The manufacturer identifies Smart, Compact, and Plus versions with 8, 10/20, and 15/30 molds per work cycle respectively.

The published T-Barmaster 400 range covers bars up to 400 oz and uses Smart, Compact, and Plus configurations. Tera lists a 30–200 kW power range across the model family, with 7/14, 10/20, or 15/30 molds per work cycle depending on version. Published standard formats include 1 oz, 50 g, 100 g, 250 g, 500 g, 1 kg, 100 oz silver, 5 kg gold, 10 kg silver, and 400 oz gold.

These are current manufacturer model-family specifications. Confirm which furnace, inductor power, molds, conveyors, cooling package, and controls are installed in the offered line. Review the official Tera Automation T-Barmaster specifications.

Production information to provide

  • Metal type, feed form, assay, and required bar weights and dimensions
  • Target bars per hour, shift schedule, finish, marking, serialization, and packaging requirements
  • Required molds, spacers, dies, electrodes, fixtures, and changeover frequency
  • Available voltage, frequency, phase, connected load, cooling, nitrogen, compressed air, ventilation, and floor loading
  • Required PLC, HMI, network, recipe, production-data, and plant-management integration

Inspection and documentation

Request current nameplate photographs, the complete equipment schedule, layout and foundation drawings, electrical and pneumatic drawings, PLC and HMI backups, software and license information, manuals, maintenance records, calibration records, production or acceptance-test data, and the tooling and spare-parts inventory.

Inspect furnace chambers and coils, conveyors and chains, molds and spacers, cooling circuits, sensors, guards, interlocks, controls, presses, marking equipment, packaging stations, and all electrical cabinets. Confirm that each station can be powered and tested safely and that required passwords, recipes, programs, and backups transfer with the equipment.

Dismantling, installation, and commissioning

Confirm component dimensions and weights, disconnection and preservation work, lift points, packing, electrical standards at destination, export documentation, freight route, foundation and utility work, line integration, operator training, and responsibilities for recommissioning and production validation.

Contact Mine Liquidators for the complete offered-equipment list, available records, inspection arrangements, location, pricing, and freight information. Also compare the Orostudio refining plant and browse our gold and silver processing equipment.